|
ENGINEERING STATUS
ROWBOT
| DATE |
2/7/22 |
| JOB # |
8885.22z(c).IV.ii |
| LOCATION |
Grand Axial Canal |
| OPPORTUNITY |
RowBot refurbished after Undul-O-Mat incident on 39/6/22 exhibiting repertoire attenuation. Sings rubbish,
repeats self. |
| REPORTED BY |
Arr Aharr (Canalman, 2nd Class) |
| ACTION |
Figarosity setting jammed at zero. Reset at cellpoint control.
Should now balance OK. |
| STATUS |
OK pending observation. -- Prebastian Huxtabude (Music Engineering
Divn). |
[ENGINEERING INDEX] [NEXT REPORT] |