|
ENGINEERING STATUS
BRIDGE
| DATE |
38/6/22 |
| JOB # |
PTNS/1331a/EXQG/1 |
| LOCATION |
Bridge |
| OPPORTUNITY |
Substantial parts of pre-commissioning navigational test and calibration
paperwork missing. |
| REPORTED BY |
Yossa gan Hoorg (Navigation Systems Divn) |
| ACTION |
Missing paperwork traced to First Class Suite #9712. Re-routed to Bridge via Suc-U-Bus system. |
| STATUS |
Enroute. Q.McB. |
| DATE |
39/6/22 |
| JOB # |
PTNS/1331a/EXQG/1B |
| LOCATION |
Bridge |
| OPPORTUNITY |
Paperwork still missing. |
| REPORTED BY |
YgH |
| ACTION |
Paperwork traced to main bilge outflow (qv) and rerouted. |
| STATUS |
Enroute. Q.McB. |
| DATE |
39/6/22 |
| JOB # |
PTNS/1331a/EXQG/1B/b |
| LOCATION |
Bridge |
| OPPORTUNITY |
Paperwork damp and stained. |
| REPORTED BY |
YgH |
| ACTION |
Paperwork dried out. Stains removed where possible. |
| STATUS |
Slightly foxed. Q.McB. |
[ENGINEERING INDEX] [NEXT REPORT] |